Jointmaster

THE PROBLEM - structural

  • Cracking in the wearing/surface course

    • usually restricted to the surface
    • timely treatment can arrest deterioration
    • avoids need for extensive refurbishment.

  • Weathering accelerates failure

    • repeated freeze/thaw cycles cause cracking
    • rapid break up of the road surface
    • undermines structure and stability of the sub-base.

  • Untreated damage

    • affects the structural layers beneath
    • may lead to full reconstruction.

THE PROBLEM - Legal

  • Ever increasing claims culture
  • Pay outs drawn from highways maintenance budget


THE PROBLEM - Financial

  • Replacement of a wearing course
  • Hidden costs of disruption
  • Traffic management
  • Environmental costs

    • excavating new aggregates
    • disposing of the old

(c) 2005 Site Management by Officepark Ltd