Asphaltic_plug_bridge_expansion_joint_1Site: New Cricketers Bridge, A322 Bagshot, Surrey. The A322 is a notorious cut through for traffic coming round the M25 to the M4 wanting to avoid the busy Heathrow section of the M25. New Cricketers Bridge over a railway line is on the A322 is less than 1 mile from Junction 3 of the M3.

Client: Ringway Infrastructure Services working as Main Contractor for Surrey County Council Structures.

Asphaltic_plug_bridge_expansion_joint_2The Problem: The Bridge expansion joints were found to be leaking but the 500mm asphaltic plug joints were so deep (up to 325mm) that curing times to get the heat out of the joint would have been at least 6 hours. This was not enough time to carry out the work during night time closures.

Solution: A weekend closure from Friday night to Sunday night. Enough crews to maximise the working window and get the job done.

Asphaltic_plug_bridge_expansion_joint_3 

 Facts & Figures
• 0.5 cub.m of asphaltic plug joint installed over 1 weekend
• Road closure from Friday night to Sunday night
• Depths of bridge joint up to 325mm
• 3 crews interchanging night and day shifts
• Contract brought in on target cost & on time
• Pressure relief drainage installed

 

 

 

 

 

 

“The Rhino team worked with us to find a practical solution to the time constraints we were under. Having allowed for contingencies to ensure the project would not over run, and with these not being required, the works were completed ahead of schedule. This allowed the road to be reopened early, reducing the impact to motorists on one of Surrey’s busiest non-trunk-route roads. They delivered on everything they promised.”

David White
Ringway Infrastructure Services

 

bexhill_loob

Bexhill_bimagrip_dynagripSite: Bexhill Railway Station Pedestrain Footbridge, East Sussex

The Job: Resurfacing of 130sq.m including bridge deck, ramps and landings. Works only to be carried out during night time closures of the bridge

Client: May Gurney working as Main Contractor for East Sussex County Council

The Problem: Deterioration of the surface

Solution: Resin bonded stone to patched surfacing and steel deck.

 

 

 

 

 

 

 

 

click below for more information
loob_base_mini_Product_Home_Page
loob_base_mini_case_studies

bridgejoint_rev1

bridgejoint_2

bridgejoint_3

bridge_expansion_joint_inspection 

Pavix_Picture_3

Pavix_Picture_1

Pavix_Picture_2

drainage_channel

 Pavix_Picture_4